KUANTAN, Nov 23 – The Pahang state government has allocated RM35 million to the Department of Irrigation and Drainage (JPS) across seven districts to execute flood mitigation and drainage improvement projects aimed at reducing flood risks during the Northeast Monsoon.
Menteri Besar Datuk Seri Wan Rosdy Wan Ismail announced on Monday, November 23, 2026, that each of the seven districts—Kuantan, Pekan, Temerloh, Lipis, Jerantut, Raub, and Maran—has received an equal allocation of RM5 million.
Replying to Datuk Andansura Rabu (PN–Beserah) during the Pahang State Legislative Assembly sitting in Kuantan regarding state efforts to resolve drainage bottlenecks and water stagnation during the monsoon season, Wan Rosdy stressed that strict regulatory approvals remain mandatory before any physical development proceeds.
“Before any development is carried out, there are certain processes that must be followed. If I am not mistaken, there are six to seven reports from relevant departments, including planning permission. If planning permission is not obtained, the development cannot proceed. However, for this effort to address flooding, the state government, through JPS, has approved RM35 million for the seven districts… and I am confident this will help, to some extent, reduce flood risks,” he said.
Two-Year Kuantan Environmentally Friendly Drainage Master Plan (PISMA) Study
Alongside immediate mitigation funding, Wan Rosdy announced that the state government, through JPS, has launched a two-year Environmentally Friendly Drainage Master Plan (PISMA) study covering the Kuantan district—including the Beserah state constituency—beginning today and running through November 20, 2028:
- Strategic Urban Planning Guide: Findings from the PISMA study will serve as an operational blueprint for JPS, the Kuantan City Council (MBK), and relevant technical agencies in formulating long-term flood strategies and guiding future land development.
- Gazetting Drainage Reserves: “The study will also serve as a basis for the state government to gazette or establish reserves… through these efforts, we can reduce the risk of flooding or water overflow,” Wan Rosdy added.
RM35 Million JPS Allocation, Development Controls, and Kuantan PISMA Study
Key state assembly disclosures, district funding breakdowns, and drainage planning initiatives include:
- RM35 Million Flood Mitigation Allocation (Nov 23, 2026): Pahang Menteri Besar Datuk Seri Wan Rosdy Wan Ismail informed the state assembly in Kuantan that RM35 million was channelled through JPS—at RM5 million each for Kuantan, Pekan, Temerloh, Lipis, Jerantut, Raub, and Maran—to mitigate monsoon flooding.
- Strict Planning Permission Rules: Responding to Datuk Andansura Rabu (PN–Beserah), Wan Rosdy reaffirmed that no development may proceed without planning permission and six to seven mandatory departmental technical reports.
- Kuantan PISMA Study (2026–2028): JPS commenced a two-year Environmentally Friendly Drainage Master Plan (PISMA) study for Kuantan (including Beserah) from Nov 23, 2026, to Nov 20, 2028, to guide JPS, Kuantan City Council, and technical departments in establishing drainage reserves and preventing water overflow.
–NMT
More Stories
Prime Minister Anwar Hails Four Malaysian Winners At 63rd Golden Horse Awards In Taiwan
Nilai Police Appeal For Public Help To Find Missing 14-Year-Old Form Two Student
Global Minimum Tax Revenue, Data Centre Water Usage, And Minimum Wage Compliance Take Spotlight In Dewan Rakyat