GUA MUSANG, Nov 22 – The highway route to Cameron Highlands remains open and accessible to motorists despite the closure of two out of four lanes along federal route FT185 Jalan Lojing–Gua Musang following a landslide on Saturday, November 21, 2026.
Kelantan Public Works Department (JKR) Director Nik Badlihisham Nik Ismail confirmed on Sunday, November 22, 2026, that road users can continue their journeys smoothly via an alternative diversion route established at the affected stretch.
He explained that the closure affects only the two left lanes of the four-lane dual carriageway heading from Gua Musang toward Cameron Highlands, while the designated diversion allows continuous traffic movement.
“JKR will apply for an allocation to carry out repair works at the affected area in the near future. In this regard, motorists are advised to always comply with the warning signs installed, particularly when passing through the diversion route,” he told reporters in Gua Musang.
Nik Badlihisham also urged motorists to reduce speed and exercise heightened vigilance when traversing the stretch to prevent any untoward incidents.
Extent of Landslide Damage at Section 84.15
On Saturday, JKR announced that the left lanes at Section 84.15 of federal route FT185 Jalan Lojing–Gua Musang, located near Yayasan Albarakah heading toward Cameron Highlands, were closed to all vehicular traffic following a morning landslide:
- Slope Failure Dimensions: The landslide impacted an area measuring 20 metres in length and 30 metres in depth.
- Road Surface Cracks: Technical inspections at the site also detected structural cracks stretching along a 30-metre section of the carriageway.
Traffic Diversion, Repair Funding Request, and Landslide Assessment
Key road access updates, repair plans, and structural findings include:
- Diversion Keeps Cameron Highlands Accessible (Nov 22, 2026): Kelantan JKR Director Nik Badlihisham Nik Ismail confirmed that although two left lanes of the four-lane FT185 Jalan Lojing–Gua Musang dual carriageway are closed, traffic toward Cameron Highlands continues via an on-site diversion route.
- Repair Allocation & Safety Advisory: JKR will apply for emergency repair funding in the near future, while urging drivers to slow down, stay alert, and obey all installed warning signs along the diversion.
- Section 84.15 Damage Scope: Triggered by a landslide on Nov 21 near Yayasan Albarakah, the affected zone spans 20 metres in length and 30 metres in depth, accompanied by cracks along a 30-metre stretch of road.
–NMT
More Stories
SMS Emergency Alerts Will Continue For Older Phones Incompatible With New Disaster Warning System, Says Fahmi
MINDEF To Form Internal Committee To Investigate Subang Air Base Drug Discovery After Police Probe
Fahmi Fadzil Salutes 35th Malaysian Film Festival Winners As Khadam Sweeps 10 Awards